Finished Schedule.

/ Thursday 15 November 2012 /
This is the completed schedule to which we should be able to stick to for filming, though we do have the time to spread out filming further we thought it is best to get as much done as soon as possible due to the evenings getting darker and the bad weather, this way if there is any instances of bad weather we have the time to rearrange a little bit.


0 comments:

Post a Comment

 
Copyright © 2010 Beth, All rights reserved
Design by DZignine. Powered by Blogger